Short winter navigation
Really alone on the water at the start of the week to validate some small software modifications in a very, very light wind… and what’s more, the days in December are short.
Really alone on the water at the start of the week to validate some small software modifications in a very, very light wind… and what’s more, the days in December are short.
(May 2023) and the latest version of the hardware (CysBOX/CysPWR 2023),before new tests in real conditions at sea…
Escale Parade: the tall ships are landing!We are just trying to get out to validate some modifications.Significant swell is not necessarily visible on the video!
Interesting weather conditions ahead of Sète (30 kts, gusting 40) for the rest of the tests which are taking place in excellent conditions.
Strong and rough seas do not allow the planned tests
The tests are used to validate the component management software.
A CysBOX is modified to validate operation with Hillcrest Labs IMU BNO085. This component integrates a triaxial accelerometer, triaxial gyroscope, magnetometer and a 32-bit processor running new firmware. It provides sophisticated signal processing algorithms to process sensor data and provide precise real-time 3D orientation, heading, calibrated acceleration and calibrated angular velocity, as well as advanced […]